Quality inspection begins with understanding the drawing, specification and acceptance requirement. Inspection activity is planned against the feature, production process, quantity, risk and customer requirement.
Production controls
Controls may include first-off verification, in-process measurement, final inspection, gauge checks, traceability and retained records. Statistical process-control methods can be considered where the production requirement justifies them.
Certified system
Capricorn Components maintains an ISO 9001:2015 certified quality management system for the design, development and manufacture of precision turned components and steel structures.