Assembly allows Capricorn Components to supply more than isolated parts where the requirement includes a defined subassembly or finished item. The route may combine internal manufacture with approved bought-out components.
Controlled inputs
The bill of materials, drawing revisions, assembly sequence, fastening requirements and inspection points should be defined before repeat production.
Final verification
Assembly checks can include fit, orientation, quantity, dimensional verification and presentation requirements according to the approved specification.